Update

I can’t believe it has been this long since I’ve posted. We’ve been busy the past 4 months. We hired electricians to completely rewire our entire home as well as install new lights, switches and outlets. Because of that we had to hire contractors to patch holes, replace bad sheetrock, frame out new walls, remove walls, tape, float, texture and paint. During this time we skipped Millie and Maze’s heat cycle and well, Winter decided she was not skipping. So we had a beautiful litter during this time. A little chaotic but we made it work.

We had to let the contractors go due to poor workmanship and lack of care for our property. So we are finishing up the last bit. We are glad things are getting back to normal and our house feels so much better.